Monday, Sep 14
Upper cabinets installed and backsplash prepped, bath 2 door hung, backsplash tile and grout prep, trim in bath 2.
Crew (3) · 21.5 h · $620.00 labor
- Receipt — The Home DepotReceipt
Bank activity
The Home Depot (card ••4417) — pending
The Home Depot (card ••4417) — pending